I have 2 3Com 5500 switch in stack and one of them is fault, I want to replace them with a new switch, which configuration must be added to the new switch before it can be added to the switch stack? (It's like a Cisco, no configuration is required?)
I have 2 3Com 5500 switch in stack and one of them is fault, I want to replace them with a new switch, which configuration must be added to the new switch before it can be added to the switch stack? (It's like a Cisco, no configuration is required?)