I have two 3750 Cisco switches that have two fiber cables/sfp modules hooked up on each. The second fiber is just for redundancy.
I have installed two new 3750X switches on the rack for the upgrade, and I would like to use these existing fibers that have been pulled to link up these new switches.
What command can I run on the 3750 switches to determine which fiber is safe to pull, so I can then use it to connect the new switches - I don't want to take down an entire floor (even temporarily!)